Al Giddiya project - SIX Flags Area

Al Giddiya project - SIX Flags Area

Al Giddiya project - SIX Flags Area

Main Contractor : FHC  future horizons Co.

ASTURAH AL SHARQ one of companies participate in Qiddiya project in electrical scope 

the project was particular in pulling cable in open trench & laying cable in side buildings , substation ... etc.  the period of the project was for  8  months at durma area of the the year 2024


  • Planning and Preparation: Before pulling cable, ensure all necessary permits and approvals are in place. Review project plans, cable specifications, and installation routes.
  • Site Assessment: Inspect the installation site to identify any obstacles or challenges, such as structural components, existing wiring, or environmental factors.
  • Safety Measures: Implement safety protocols, including personal protective equipment (PPE), proper lifting techniques, and electrical safety practices.
  • Cable Selection: Confirm that the appropriate type and gauge of cable are selected based on the project's requirements and electrical load calculations.
  • Cable Pulling: Use appropriate tools and equipment (such as cable pullers, fish tapes, and lubricant) to facilitate the pulling process. Ensure that the cable is pulled smoothly to avoid damage.