مشاريع الشركة

ما هي ابرز مشاريع الشركة ؟

Al Giddiya project - SIX Flags Area

Main Contractor : FHC  future horizons Co.

ASTURAH AL SHARQ one of companies participate in Qiddiya project in electrical scope 

the project was particular in pulling cable in open trench & laying cable in side buildings , substation ... etc.  the period of the project was for  8  months at durma area of the the year 2024


TBC _ Primary & Secondary schools for Boys & Girls ( 4 schools )

MEP - Electrical &  Plumping 

Location: Al Riyadh - Al Azizia District
Scope of Work: MEP Scope ( electrical & Plumping 

  • Electrical:  first fix pipes & boxes in concrete , pulling  wires , install devices with lighting , AC & Main panels.
  • Plumbing: [Details like water supply, drainage, and piping systems]
    Duration: [04-2022 - 10-2023]

Al Riyadh Avenue project - Pulling Cables


Al Riyadh Avenue project 2024 ,  Cable Pulling work for MV cables 3x500 mm more than 53000 Meters. on the cable Ladder & cable trays.



- cable pulling work on cable ladder & trays 

- cable pulling work on Ceiling

Saudi Arabian Military Industries (SAMI)

Cable pulling on a ladder involves installing cables along a cable ladder system, which is typically used to organize and support cables in industrial, commercial, or construction settings. Here's a brief overview of the process:

  1. Setup: First, ensure the cable ladder is securely mounted and level, providing a clear and safe path for the cables.
  2. Cable Preparation: Inspect and prepare the cables by checking for damage and ensuring proper lubrication to reduce friction during the pull.
  3. Pulling Process: The cables are pulled along the ladder, either manually or with mechanical aids like winches. Care must be taken to avoid sharp bends and excessive tension, which could damage the cables.
  • Securing the Cables: Once the cables are in place, they are secured to the ladder with cable ties or clips to prevent movement and ensure proper routing.
  1. Safety: Throughout the process, proper safety equipment and techniques should be used to avoid injuries, particularly when dealing with heavy cables or working in confined spaces.

This work requires physical effort, coordination, and attention to detail to ensure cables are installed safely and efficiently.


Al Qaryan steel plant (القريان للحديد) is a steel plant in Dammam Industrial City

 Cable pulling in a steel plant factory is a critical task that requires precision, coordination, and safety, as it typically involves working in a high-risk industrial environment. In such a setting, the process usually entails pulling cables for power, control systems, instrumentation, or communication networks. Here’s an overview of the key aspects involved in cable pulling within a steel plant factory: 

1. Preparation and Planning

  • Design and Layout: The first step is to determine the cable routes. In a steel plant, cables might need to be pulled through challenging environments, such as areas with high temperatures, heavy machinery, or corrosive atmospheres. Detailed planning is required to select the appropriate cable types (e.g., fire-resistant, high-temperature cables).
  • Cable Ladder/Tray Setup: Cable ladders or trays are installed along predetermined paths, ensuring they’re securely mounted and can support the weight of the cables being pulled.
  • Safety Precautions: In a steel plant, the environment can be hazardous, with heavy machinery, hot surfaces, and loud noise. Workers need to use appropriate PPE (Personal Protective Equipment), including gloves, hard hats, safety boots, ear protection, and possibly heat-resistant gear.